developerhas.blogg.se

Phase diagram water cad model
Phase diagram water cad model












The specific areas of work in this project are: Budget Period 1: Sustainable Energy Solutions, LLC (SES) has successfully demonstrated a dryer that removes bulk water using a low-temperature brine to remove about 99% of the water followed by a mol sieve 3A desiccant dryer to remove the remaining 1% water. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding.

phase diagram water cad model

Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. 13.1.4) and only gravity loads need be considered.This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. (2) In the event that SDC C applies and the enclosure(s) in question is “unimportant (i.e., Ip = 1.0 per ASCE 7),” then the enclosure(s) is seismically exempt (per ASCE 7 para. Two Notes: (1) Hilti KB-TZ2 may be directly substituted for TZ in this detail. NOTE: If the MCC is “unimportant (i.e., Ip = 1.0 per ASCE 7)” and being installed as part of a new- or existing-building project in which the seismic design of the building is based on SDC C, then the MCC is seismically exempt (per ASCE 7 para. Housekeeping Pad to Existing Slab Anchorage MOTOR CONTROL CENTER ANCHORAGE (INTERIOR) Metal Stairs - General Notes Optional Use Tie-down quantities Considering Topographic Factor Single Wide Trailer Requirements for In-Situ Soilįoundation Support System for Temporary Trailers-double wide Structural (Chapter 5) POC: Michael Denlinger, ES-EPD, 667-6572 Suggestions (LANL ONLY use IE)įOUNDATION SUPPORT SYSTEM FOR TEMPORARY TRAILERS On-Building Identification Letters and Detailīuilding Identification Plaques and Detail STANDARD DETAILS-G2040 EXTERIOR WAYFINDINGįacility Complex Identification Sign and Detailįreestanding Building Identification Sign and Detail Gas Piping Tie-In, PE Service Line to PE MainĪrchitectural (Chapter 4) POC: Scott Richardson, ES-EPD, 606-0596 Alt: TBD Suggestions (LANL ONLY use IE) Gas Piping Tie-In, PE Service Line to Steel Main Gas Piping Tie-In, Steel Service Line to Steel Main Water Piping Shut-Off Valve, for Fire Line (PIV) Water Piping Shut-Off Valve, 4" - 12" Line Size Water Piping Tie-In, 4" - 12" Service Line Water Piping Tie-In, 3/4" - 2" Copper Service Line Parking Layout (Accessible and Motorcycle)įence- Smooth Strand Single or Double Gateīollard Sprinkler System Riser Detail - Backflow Preventer/Design Notes Ĭivil (Chapter 3) POC: John O'Brien, ES-UI, 606-0335 List of Complete Alternates Suggestions (LANL ONLY use IE) Sprinkler System Riser Detail - Dry Pipe Sprinkler System Riser Detail - Pre-Action Sprinkler System Riser Detail - Wet Pipe (Transportable)

phase diagram water cad model

#Phase diagram water cad model pdf#

The PDF files open with Adobe Acrobat.įire Protection | Civil | Architectural | Structural | Mechanical | Electrical | Instrumentation & Control |įire Protection (Chapter 2) POC: Todd Smith, ES-EPD, 665-3152 Alt: Scott McMurtrey, ES-EPD Suggestions (LANL ONLY use IE) Netscape users-right click on AutoCad icon and select "Save Target As" to save to your computer and then open.

phase diagram water cad model

You can also view the CAD drawings using Voloview.












Phase diagram water cad model